The hull is alomst completed. Mike the welder has welded in 2 steel plates on either side of the keel approx. 8' long x 36" wide. As seen below.


The engine team headed up by Mr. Ratinaud and cadet Ratinaud have rebuilt the started for the 2 cylinder Volvo diesel engine. The engine has been inspected and looks clean. The team will attempt to start the engine once they install the starter motor.
The Finish Trim Team includes Mr. Bardley and Navy League Cadet Bradley. Their many focus at this stage will be to re-build the Captains Steering Pedistal and refinish the bowsprit and area around the bowsprit.
The interior team is still being assembled. The first task they will have is to reconstruct the floor using the floor that was removed and adding to it as needed.
The immediate goal is to have the "Tamarack" water ready by June 2011. This includes paint on the hull and deck, A cabin top, Working Engine, Cabin floor and all the equipment for navigation and safety as we see fit.
LAUNCH DATE JUNE 2011:
The interior team is still being assembled. The first task they will have is to reconstruct the floor using the floor that was removed and adding to it as needed.
The immediate goal is to have the "Tamarack" water ready by June 2011. This includes paint on the hull and deck, A cabin top, Working Engine, Cabin floor and all the equipment for navigation and safety as we see fit.
LAUNCH DATE JUNE 2011:
Just uploaded a photo of Tamarack at the Greaves home.
ReplyDeletehttp://www.flickr.com/photos/gtnorton/5328850171/